Dioro & Beryl at Brigade El Dorado
Brigade Group · KIADB / Bagalur · KIADB Aerospace Park, Bagalur (near Shell Technology Centre)
₹0.89 to 1.27 Cr974 to 1,382 sqft
This is a directory listing: verified facts and the desk's note, not a full BangaloreSelect report with scoring breakdown, FAQs and neighbourhood mapping.
How coverage tiers work →The desk's read
Dioro & Beryl at Brigade El Dorado is an apartment project by Brigade Group in KIADB Aerospace Park, Bagalur (near Shell Technology Centre), under construction. 1279 units; 10 acres; 974 to 1382 sqft. Priced INR 89,00,000 - INR 1,27,00,000 (about INR 9,500 psf).
Desk note
Lifecycle: under_construction (freshness pass tier 1). price: developer quote as of 2026-08, tier 1, medium confidence, https://www.brigadegroup.com/residential/projects/bengaluru/brigade-el-dorado. scale: freshness pass tier 3 https://www.commonfloor.com/dioro-beryl-at-brigade-el-dorado-bangalore/povp-k937xb. Configurations from freshness pass. No synthetic placeholders in use. Freshness-pass flags: Official page confirms min price (2 BHK from Rs 89 L) and SBA 535-1,382 sqft; max price is portal (tier 3).; Baseline config pairs 535 sqft with Rs 89 L giving 16,636 psf - mismatch; 535 sqft is the smallest unit, Rs 89 L is the 974 sqft 2 BHK.; Unit count discrepancy: K-RERA 1,348 vs CommonFloor 1,279.; Campus-level sub-projects on brigadegroup.com: Beryl, Dioro, Aurum, Cobalt, Gallium, Helio, Jasper, Feldspar, Krypton, Iridium, Emerald, Luminaire - keep TWN-003 as the campus parent.; Under-construction status as of July 2026 (official construction updates: finishing, painting, flooring).. psf of ~9,500 is computed from CommonFloor price/size pairs; note older El Dorado phases are completed (possession from Dec 2024 per NoBroker).
What to verify
Verify RERA PRM/KA/RERA/1251/309/PR/160224/006634 on rera.karnataka.gov.in. RERA number confirmed in freshness pass. Confirm current price band with the developer (currently developer quote basis).
Verified facts
Figures from developer disclosures and RERA filings, as tracked on 2026-08-22. Verify the registration on the state RERA portal before any payment.
Fully covered in KIADB / Bagalur

